This is step 2 in a 24 step video series that shows you how to install the corner or eave brackets in a Sierra model Absolute Steel building.
This particular building is a Sierra model and uses a corner eave bracket. These come to you unfolded for packing purposes and you need to fold them to fit the corners of your eave. Place the eave brackets on the bent corners of the side bend. Align the bracket with the roof slope and side wall portions of the side bend using a straight edge and attach them with 4 screws on each side.

Take measurements from the first assembly and transfer that measurement to the remaining side bends to help keep all of the corner brackets in the same position on the side bends. This will ensure your building is straight and correct.
![]() Step 3: Roof & Wall Assembly |
Video Index:
|
Introduction 1. The foundation 2. Eave or corner brackets 3. Roof & wall assembly 4. Truss assembly 5. Hat channel spacing 6. Base rail assembly 7. Anchoring base rails 8. Wall & roof to base |
9. Squaring up the frame 10. Install back enclosure 11. Install front enclosure 12. Door & window frame 13. Girts & hat channel 14. Radiant barrier insulation 15. Side exterior panels 16. Gable end panels |
17. Door & window trim 18. Corner trim 19. Roof panels 20. Doors & windows 21. Eave trim 22. Gable trim 23. Ridge cap 24. Finishing touches |
You might be interested in viewing these:
Written by: Robert Armstrong














